> ## Documentation Index
> Fetch the complete documentation index at: https://docs.aigoframework.com/llms.txt
> Use this file to discover all available pages before exploring further.

# 08 AIGO AI Risk Acceptance Template v0.1

# AIGO — AI Governance Operating Framework

## AI Risk Acceptance Template

**Version:** 0.1
**Status:** Draft
**Working Name:** AIGO
**Full Name:** AI Governance Operating Framework
**Document Identifier:** `AIGO-TPL-008`
**Document Type:** AI Risk Acceptance Template
**Template Purpose:** Controlled Acceptance, Escalation, and Review of Residual AI Risk

***

# 1. Template Purpose

This template provides the controlled structure for documenting a decision to accept residual AI risk within the AIGO AI Governance Operating Framework.

Risk acceptance is used only after the organization has:

* identified the AI risk;
* assessed the risk;
* considered treatment options;
* evaluated applicable controls;
* determined residual risk;
* considered applicable requirements;
* determined that acceptance is within authorized tolerance;
* identified an appropriate acceptance authority;
* established monitoring and review requirements.

Risk acceptance does not mean that the risk has been eliminated.

It means that an authorized decision-maker has consciously accepted the remaining risk under defined conditions.

This template does not replace the organization's approved AIGO AI Risk Acceptance Procedure.

***

# 2. Acceptance Instructions

Complete all applicable sections.

Where information is not available, record:

**Pending — \[reason]**

Where a section does not apply, record:

**Not Applicable — \[reason]**

Every accepted risk should have a unique Risk ID.

Where possible, maintain traceability to:

* AI System ID;
* Risk Assessment ID;
* Risk ID;
* Control ID;
* Treatment ID;
* Approval ID;
* Evidence ID;
* Monitoring ID;
* Incident ID;
* Change ID;
* Assurance ID;
* Management Review ID.

Risk acceptance should be time-bounded or subject to defined review unless the organization's approved methodology explicitly permits otherwise.

***

# 3. Risk Acceptance Record

## 3.1 Identification

**AI System ID:**

**Risk Acceptance ID:**

**Risk ID:**

**Risk Assessment ID:**

**Acceptance Version:**

**Acceptance Status:**

* Draft
* Under Review
* Pending Approval
* Approved
* Approved with Conditions
* Deferred
* Rejected
* Expired
* Revoked
* Closed

**Risk Owner:**

**Acceptance Owner:**

**Prepared By:**

**Reviewer:**

**Approval Authority:**

**Date Prepared:**

**Decision Date:**

**Effective Date:**

**Review Date:**

**Expiry Date:**

***

# 4. AI System Context

## 4.1 AI System

**System Name:**

**System Version:**

**System Owner:**

**Business Owner:**

**Technical Owner:**

**Current Lifecycle Stage:**

**AIGO Classification:**

## 4.2 Intended Purpose

**Approved Intended Purpose:**

## 4.3 Operating Context

**Relevant Operating Context:**

***

# 5. Risk Being Accepted

## 5.1 Risk Statement

**Risk Title:**

**Risk Statement:**

## 5.2 Risk Cause

**Cause(s):**

## 5.3 Risk Event

**Risk Event:**

## 5.4 Potential Consequence

**Potential Consequence(s):**

## 5.5 Affected Stakeholders

**Affected Stakeholders / Persons:**

## 5.6 Potential Harm

**Potential Harm:**

***

# 6. Risk Assessment

## 6.1 Assessment Reference

**Risk Assessment ID:**

**Assessment Date:**

**Assessment Owner:**

## 6.2 Inherent Risk

**Likelihood Score:**

**Likelihood Level:**

**Impact Score:**

**Impact Level:**

**Inherent Risk Score:**

**Inherent Risk Level:**

**Inherent Risk Rationale:**

## 6.3 Residual Risk

**Residual Likelihood Score:**

**Residual Likelihood Level:**

**Residual Impact Score:**

**Residual Impact Level:**

**Residual Risk Score:**

**Residual Risk Level:**

**Residual Risk Rationale:**

***

# 7. Risk Treatment Review

## 7.1 Treatment Options Considered

Options may include:

* Avoid
* Reduce
* Mitigate
* Transfer
* Restrict
* Share
* Accept
* Suspend
* Retire

**Treatment Options Considered:**

## 7.2 Selected Treatment

**Selected Treatment:**

## 7.3 Treatment Rationale

**Why this treatment was selected:**

## 7.4 Treatment Status

**Treatment Status:**

* Complete
* Substantially Complete
* Partially Complete
* Outstanding
* Not Applicable

**Rationale:**

***

# 8. Controls Applied

## 8.1 Existing Controls

| Control ID | Control | Owner | Effectiveness | Evidence |
| ---------- | ------- | ----- | ------------- | -------- |
|            |         |       |               |          |
|            |         |       |               |          |
|            |         |       |               |          |

## 8.2 Critical Controls

**Critical Controls:**

## 8.3 Control Assessment

**Control Assessment ID:**

**Assessment Date:**

**Overall Control Effectiveness:**

## 8.4 Control Limitations

**Known Control Limitations:**

***

# 9. Why Risk Remains

Residual risk may remain because of:

* technical limitations;
* uncertainty;
* incomplete information;
* unavoidable exposure;
* business necessity;
* cost / proportionality;
* limitations in available controls;
* third-party dependency;
* operational constraints;
* residual uncertainty.

**Reason Residual Risk Remains:**

***

# 10. Alternatives Considered

## 10.1 Alternative Treatment Options

| Option | Description | Risk Reduction | Feasibility | Cost / Impact | Decision |
| ------ | ----------- | -------------- | ----------- | ------------- | -------- |
|        |             |                |             |               |          |
|        |             |                |             |               |          |
|        |             |                |             |               |          |

## 10.2 Alternatives Rejected

**Rejected Alternatives:**

## 10.3 Rejection Rationale

**Rationale:**

***

# 11. Risk Tolerance Assessment

## 11.1 Organizational Risk Appetite

**Applicable AI Risk Appetite:**

## 11.2 Risk Tolerance

**Applicable Risk Tolerance:**

## 11.3 Within Tolerance?

**Is the residual risk within authorized tolerance?**

* Yes
* No
* Conditional
* Unclear

**Rationale:**

## 11.4 Risk Acceptance Authority

**Authority Required to Accept This Risk:**

**Authority Basis / Delegation Reference:**

***

# 12. Regulatory and Legal Review

## 12.1 Applicable Requirements

| Requirement | Applicability | Impact on Acceptance | Owner | Evidence |
| ----------- | ------------- | -------------------- | ----- | -------- |
|             |               |                      |       |          |
|             |               |                      |       |          |
|             |               |                      |       |          |

## 12.2 Legal / Regulatory Constraint

**Does any requirement prohibit or materially restrict acceptance of this risk?**

* Yes
* No
* Pending Review

**Rationale:**

## 12.3 Legal / Compliance Review

**Reviewer:**

**Result:**

**Date:**

**Evidence ID:**

***

# 13. Human Impact Review

## 13.1 Affected Persons

**Affected Persons:**

## 13.2 Potential Harm

**Potential Harm:**

## 13.3 Reversibility

**Reversibility:**

* Fully Reversible
* Substantially Reversible
* Partially Reversible
* Limited
* Irreversible

**Rationale:**

## 13.4 Human Oversight

**Human Oversight Available:**

**Human Oversight Adequacy:**

**Evidence ID:**

***

# 14. Uncertainty Review

## 14.1 Known Uncertainties

**Uncertainties:**

## 14.2 Uncertainty Significance

**Uncertainty Level:**

* Low
* Medium
* High
* Critical

**Rationale:**

## 14.3 Unknowns Affecting Acceptance

**Material Unknowns:**

## 14.4 Uncertainty Monitoring

**Monitoring Requirements:**

***

# 15. Third-Party and Supply-Chain Considerations

## 15.1 Third-Party Dependency

**Relevant Third Parties:**

## 15.2 Supplier Risk

**Supplier Risk Level:**

## 15.3 Supplier Controls

**Controls:**

## 15.4 Supplier Assurance

**Evidence / Assurance Reference:**

## 15.5 Supplier Change Risk

**Supplier Change Considerations:**

***

# 16. Monitoring Requirements

Risk acceptance should include monitoring sufficient to determine whether the accepted risk remains within tolerance.

## 16.1 Risk Indicators

| Indicator | Threshold | Frequency | Owner | Escalation | Evidence |
| --------- | --------- | --------- | ----- | ---------- | -------- |
|           |           |           |       |            |          |
|           |           |           |       |            |          |
|           |           |           |       |            |          |

## 16.2 Monitoring Owner

**Monitoring Owner:**

## 16.3 Monitoring Frequency

**Frequency:**

## 16.4 Threshold Breach

**Required Action if Threshold Is Breached:**

***

# 17. Acceptance Conditions

Risk acceptance may be subject to conditions.

| Condition ID | Condition | Owner | Due Date | Verification | Status |
| ------------ | --------- | ----- | -------- | ------------ | ------ |
|              |           |       |          |              |        |
|              |           |       |          |              |        |
|              |           |       |          |              |        |

## 17.1 Mandatory Conditions

**Conditions that must remain satisfied:**

*
*
*

## 17.2 Condition Failure

**Action if a condition is not satisfied:**

***

# 18. Escalation Requirements

## 18.1 Escalation Triggers

Escalation may be required when:

* residual risk exceeds tolerance;
* a critical control fails;
* a material incident occurs;
* monitoring thresholds are breached;
* new harm is identified;
* system context changes;
* classification changes;
* legal or regulatory requirements change;
* risk treatment becomes ineffective.

**Applicable Triggers:**

## 18.2 Escalation Path

**Escalation Path:**

## 18.3 Escalation Authority

**Escalation Authority:**

***

# 19. Acceptance Period

## 19.1 Effective Period

**Effective From:**

**Effective Until:**

## 19.2 Review Frequency

**Review Frequency:**

## 19.3 Automatic Expiry

**Does the acceptance automatically expire?**

* Yes
* No

**Expiry Rule:**

## 19.4 Renewal

**Renewal Requirements:**

***

# 20. Approval Decision

## 20.1 Decision Options

* Approved
* Approved with Conditions
* Deferred
* Rejected
* Escalated
* Suspended
* Revoked

## 20.2 Final Decision

**Decision:**

## 20.3 Decision Rationale

**Rationale:**

## 20.4 Approved Risk Position

**Approved Residual Risk Level:**

## 20.5 Approved Scope

**Scope of Acceptance:**

## 20.6 Restrictions

**Restrictions:**

***

# 21. Acceptance Authority

## 21.1 Decision Authority

**Acceptance Authority:**

**Role:**

## 21.2 Authority Basis

**Authority Basis / Delegation Reference:**

## 21.3 Authority Verification

**Authority Verified By:**

**Verification Date:**

***

# 22. Segregation of Duties

Where practical, risk acceptance should separate:

* risk identification;
* risk assessment;
* treatment recommendation;
* risk acceptance;
* independent assurance.

## 22.1 Role Separation

| Activity                  | Owner | Reviewer | Approver |
| ------------------------- | ----- | -------- | -------- |
| Risk Assessment           |       |          |          |
| Treatment Recommendation  |       |          |          |
| Acceptance Recommendation |       |          |          |
| Risk Acceptance           |       |          |          |
| Assurance                 |       |          |          |

***

# 23. Evidence

## 23.1 Evidence Repository

**Evidence Repository:**

**Evidence Owner:**

## 23.2 Supporting Evidence

| Evidence ID | Evidence Type | Description | Owner | Date | Location | Status |
| ----------- | ------------- | ----------- | ----- | ---- | -------- | ------ |
|             |               |             |       |      |          |        |
|             |               |             |       |      |          |        |
|             |               |             |       |      |          |        |

## 23.3 Evidence Completeness

**Evidence Status:**

* Complete
* Substantially Complete
* Partially Complete
* Incomplete

**Evidence Gaps:**

## 23.4 Evidence Quality

**Evidence Quality:**

* Strong
* Adequate
* Moderate
* Weak
* Insufficient

**Rationale:**

***

# 24. Monitoring and Review Results

## 24.1 Latest Review

**Review Date:**

**Reviewer:**

**Risk Status:**

**Control Status:**

**Monitoring Status:**

## 24.2 Review Result

**Result:**

* Continue Acceptance
* Modify Conditions
* Reduce Risk Further
* Escalate
* Suspend Acceptance
* Revoke Acceptance
* Close Acceptance

**Rationale:**

***

# 25. Triggered Reassessment

## 25.1 Trigger

**Was this acceptance triggered by an incident, change, monitoring result, or other event?**

* Yes
* No

**Trigger Type:**

**Reference ID:**

## 25.2 Reassessment

**Reassessment Required:**

**Reassessment ID:**

**Outcome:**

***

# 26. Incident Relationship

## 26.1 Related Incidents

| Incident ID | Date | Severity | Risk Impact | Action | Status |
| ----------- | ---- | -------- | ----------- | ------ | ------ |
|             |      |          |             |        |        |
|             |      |          |             |        |        |

## 26.2 Incident Impact

**Impact of Related Incidents on Acceptance:**

***

# 27. Change Relationship

## 27.1 Related Changes

| Change ID | Date | Description | Risk Impact | Approval | Status |
| --------- | ---- | ----------- | ----------- | -------- | ------ |
|           |      |             |             |          |        |
|           |      |             |             |          |        |

## 27.2 Change Impact on Acceptance

**Impact:**

***

# 28. Assurance Relationship

## 28.1 Related Assurance

| Assurance ID | Date | Finding | Risk Impact | Status |
| ------------ | ---- | ------- | ----------- | ------ |
|              |      |         |             |        |
|              |      |         |             |        |

## 28.2 Assurance Findings

**Open Assurance Findings Affecting This Acceptance:**

***

# 29. Management Review

## 29.1 Management Review Required

**Required:**

## 29.2 Review Reference

**Management Review ID:**

**Review Date:**

## 29.3 Management Review Outcome

**Outcome:**

## 29.4 Management Actions

**Actions:**

***

# 30. Acceptance Lifecycle

The risk acceptance should be managed through a controlled lifecycle.

```text theme={null}
Risk Identified
      ↓
Risk Assessed
      ↓
Treatment Options Considered
      ↓
Controls Evaluated
      ↓
Residual Risk Determined
      ↓
Acceptance Criteria Reviewed
      ↓
Acceptance Authority Identified
      ↓
Decision
   ↙        ↘
Accept     Reject / Escalate
   ↓
Conditions
   ↓
Monitoring
   ↓
Periodic Review
   ↓
Renew / Modify / Close / Revoke
```

***

# 31. Acceptance-to-Risk Traceability

| Risk ID | Risk Assessment | Inherent Risk | Residual Risk | Acceptance | Authority |
| ------- | --------------- | ------------- | ------------- | ---------- | --------- |
|         |                 |               |               |            |           |
|         |                 |               |               |            |           |

***

# 32. Acceptance-to-Control Traceability

| Risk ID | Control ID | Control Effectiveness | Residual Risk | Acceptance Condition |
| ------- | ---------- | --------------------- | ------------- | -------------------- |
|         |            |                       |               |                      |
|         |            |                       |               |                      |

***

# 33. Acceptance-to-Evidence Traceability

| Risk ID | Evidence ID | Evidence Type | Evidence Status | Review Date |
| ------- | ----------- | ------------- | --------------- | ----------- |
|         |             |               |                 |             |
|         |             |               |                 |             |

***

# 34. Acceptance Decision Quality Review

Before final approval, verify:

* [ ] Risk is clearly identified
* [ ] Risk assessment is current
* [ ] Inherent risk is documented
* [ ] Controls are identified
* [ ] Control effectiveness is assessed
* [ ] Residual risk is documented
* [ ] Treatment options were considered
* [ ] Alternatives were considered
* [ ] Applicable requirements were reviewed
* [ ] Human impact was considered
* [ ] Uncertainty was considered
* [ ] Third-party dependency was considered where applicable
* [ ] Monitoring requirements are defined
* [ ] Acceptance conditions are defined
* [ ] Escalation triggers are defined
* [ ] Acceptance period is defined
* [ ] Acceptance authority is authorized
* [ ] Segregation of duties is considered
* [ ] Evidence is sufficient
* [ ] Related incidents are reviewed
* [ ] Related changes are reviewed
* [ ] Assurance findings are reviewed
* [ ] Management review is completed where required
* [ ] Final decision is recorded
* [ ] Review date is established
* [ ] Related AIGO records are linked

***

# 35. Acceptance Review and Reapproval

## 35.1 Periodic Review

**Review Frequency:**

**Next Review Date:**

**Review Owner:**

## 35.2 Reapproval Triggers

Reapproval should be considered after:

* material changes;
* significant incidents;
* material monitoring deviations;
* significant increases in residual risk;
* control failures;
* classification changes;
* new legal or regulatory requirements;
* changes in risk appetite;
* expiration of acceptance period.

**Additional Triggers:**

***

# 36. Acceptance Change History

| Version | Date | Change                  | Changed By | Reviewer | Approval |
| ------- | ---- | ----------------------- | ---------- | -------- | -------- |
| 0.1     |      | Initial risk acceptance |            |          |          |
|         |      |                         |            |          |          |

***

# 37. Final Acceptance Record

**AI System ID:**

**Risk ID:**

**Risk Acceptance ID:**

**Residual Risk:**

**Decision:**

**Conditions:**

**Risk Owner:**

**Acceptance Authority:**

**Effective Date:**

**Expiry Date:**

**Next Review Date:**

**Monitoring Requirement:**

**Status:**

***

# 38. Template Usage Instructions

This template should be completed according to the organization's approved AIGO AI Risk Acceptance Procedure.

Risk acceptance should only be used where the organization has first evaluated reasonable treatment options.

Acceptance should not be used to bypass:

* mandatory legal requirements;
* required controls;
* required approvals;
* prohibited uses;
* unacceptable risks;
* mandatory incident response;
* required human oversight.

The acceptance authority should have sufficient authority for the level of residual risk being accepted.

Where residual risk exceeds the authority's tolerance or delegated authority, the risk should be escalated.

Risk acceptance should be reviewed when the accepted risk, system, controls, operating context, or applicable requirements materially change.

***

# 39. Template Governance

## 39.1 Template Owner

**Template Owner:**

## 39.2 Template Review

**Review Frequency:**

**Next Review Date:**

## 39.3 Template Change Control

Changes to this template should be managed through the applicable AIGO document and change-management process.

Material changes should consider their effect on:

* AI Risk Acceptance Procedure;
* AI Risk Assessment;
* AI System Profile;
* AI Classification;
* Control Assessment;
* Approval;
* Monitoring;
* Incident Management;
* Change Management;
* Assurance;
* Management Review;
* schemas;
* mappings;
* tools.

***

# 40. Document Control

| Field               | Value                              |
| ------------------- | ---------------------------------- |
| Document            | AIGO — AI Risk Acceptance Template |
| Version             | 0.1                                |
| Status              | Draft                              |
| Document Identifier | `AIGO-TPL-008`                     |
| Document Type       | AI Risk Acceptance Template        |
| Template Owner      |                                    |
| Approved By         |                                    |
| Approval Date       |                                    |
| Effective Date      |                                    |
| Next Review Date    |                                    |

***

# 41. Template Status

**Document:** AIGO — AI Risk Acceptance Template

**Version:** 0.1

**Status:** Draft

**Working Name:** AIGO

**Full Name:** AI Governance Operating Framework

**Document Identifier:** `AIGO-TPL-008`

**Document Type:** AI Risk Acceptance Template

This template provides the controlled structure for documenting, approving, monitoring, reviewing, renewing, modifying, suspending, or revoking acceptance of residual AI risk within the AIGO AI Governance Operating Framework.

***

# 42. End of Template

**AIGO — AI Risk Acceptance Template**

**Document ID:** `AIGO-TPL-008`

**Version:** 0.1

**Status:** Draft

**End of Template**
