# 05 AIGO AI Risk Assessment Template v0.1

# AIGO — AI Governance Operating Framework

## AI Risk Assessment Template

**Version:** 0.1
**Status:** Draft
**Working Name:** AIGO
**Full Name:** AI Governance Operating Framework
**Document Identifier:** `AIGO-TPL-005`
**Document Type:** AI Risk Assessment Template
**Template Purpose:** Controlled Identification, Analysis, Evaluation, Treatment, and Acceptance of AI Risk

***

# 1. Template Purpose

This template provides the controlled structure for assessing AI-related risks within the AIGO AI Governance Operating Framework.

The risk assessment should establish traceability between:

* AI system;
* intended purpose;
* operating context;
* stakeholders;
* affected persons;
* risk scenarios;
* potential harms;
* likelihood;
* impact;
* inherent risk;
* controls;
* treatment;
* control effectiveness;
* residual risk;
* risk acceptance;
* escalation;
* monitoring;
* reassessment;
* evidence;
* governance decisions.

This template does not replace the organization's approved AI Risk Assessment Procedure.

Risk assessment should be performed throughout the AI lifecycle and updated when material changes, incidents, monitoring findings, or changes in context require reassessment.

***

# 2. Assessment Instructions

Complete all applicable sections.

Where information is not yet available, record:

**Pending — \[reason]**

Where a field does not apply, record:

**Not Applicable — \[reason]**

Each material risk should have a unique Risk ID.

Recommended identifiers include:

* AI System ID;
* Risk Assessment ID;
* Risk ID;
* Control ID;
* Treatment ID;
* Evidence ID;
* Decision ID;
* Incident ID;
* Change ID;
* Monitoring ID.

Risk ratings and acceptance thresholds should follow the organization's approved risk methodology.

***

# 3. Assessment Record

## 3.1 Identification

**AI System ID:**

**Risk Assessment ID:**

**Assessment Version:**

**Assessment Type:**

* Initial
* Periodic
* Triggered
* Post-Incident
* Post-Change
* Reassessment
* Retirement

**Assessment Status:**

* Draft
* In Progress
* Under Review
* Approved
* Approved with Conditions
* Reassessment Required
* Closed

**Assessment Owner:**

**Risk Owner:**

**Lead Assessor:**

**Reviewer:**

**Approval Authority:**

**Assessment Date:**

**Effective Date:**

**Next Review Date:**

***

# 4. AI System Context

## 4.1 System Information

**System Name:**

**System Version:**

**Business Owner:**

**AI System Owner:**

**Technical Owner:**

**Current Lifecycle Stage:**

**AIGO Classification:**

## 4.2 Intended Purpose

**Approved Intended Purpose:**

## 4.3 Intended Use

**Approved Intended Use:**

## 4.4 Restricted / Prohibited Use

**Restricted Uses:**

**Prohibited Uses:**

## 4.5 Business Process

**Business Process Supported:**

## 4.6 Operating Environment

**Operating Environment:**

***

# 5. Assessment Scope

## 5.1 Scope

**Assessment Scope:**

## 5.2 Lifecycle Scope

Select applicable lifecycle stages:

* Govern
* Identify
* Classify
* Assess
* Treat
* Approve
* Deploy
* Operate
* Monitor
* Assure
* Improve
* Change
* Continue
* Retire

**Applicable Lifecycle Stages:**

## 5.3 Geographic Scope

**Jurisdictions / Locations:**

## 5.4 Organizational Scope

**Business Units / Functions Covered:**

## 5.5 Exclusions

**Excluded Areas:**

**Exclusion Rationale:**

***

# 6. Assessment Context

## 6.1 Organizational Context

**Relevant Organizational Context:**

## 6.2 AI-System Context

**Relevant AI-System Context:**

## 6.3 External Context

Consider:

* laws;
* regulations;
* standards;
* contractual requirements;
* market conditions;
* threat environment;
* stakeholder expectations.

**Relevant External Context:**

## 6.4 Assumptions

**Assessment Assumptions:**

*
*
*

## 6.5 Constraints

**Assessment Constraints:**

*
*
*

***

# 7. Stakeholder and Affected-Person Assessment

## 7.1 Stakeholders

| Stakeholder | Role / Interest | Potential Impact | Risk Relevance | Owner |
| ----------- | --------------- | ---------------- | -------------- | ----- |
|             |                 |                  |                |       |
|             |                 |                  |                |       |
|             |                 |                  |                |       |

## 7.2 Affected Persons

**Affected Persons:**

## 7.3 Affected Groups

**Potentially Affected Groups:**

## 7.4 Potential Harm

Potential harms may include:

* financial harm;
* physical harm;
* psychological harm;
* privacy harm;
* security harm;
* discrimination;
* loss of opportunity;
* operational harm;
* legal harm;
* reputational harm;
* societal harm.

**Potential Harm Areas:**

## 7.5 Stakeholder Input

**Stakeholder Consultation / Input:**

**Supporting Evidence IDs:**

***

# 8. Risk Assessment Methodology

## 8.1 Risk Methodology

**Approved Risk Methodology:**

## 8.2 Risk Model

**Risk Calculation Method:**

Example:

**Risk Score = Likelihood × Impact**

## 8.3 Likelihood Scale

| Score | Level          | Description                    |
| ----: | -------------- | ------------------------------ |
|     1 | Rare           | Highly unlikely                |
|     2 | Unlikely       | Could occur occasionally       |
|     3 | Possible       | May occur                      |
|     4 | Likely         | Expected to occur periodically |
|     5 | Almost Certain | Expected to occur frequently   |

**Organization-Specific Modifications:**

## 8.4 Impact Scale

| Score | Level         | Description                                      |
| ----: | ------------- | ------------------------------------------------ |
|     1 | Insignificant | Minimal consequence                              |
|     2 | Minor         | Limited consequence                              |
|     3 | Moderate      | Material but manageable consequence              |
|     4 | Major         | Serious consequence                              |
|     5 | Severe        | Very serious or potentially systemic consequence |

**Organization-Specific Modifications:**

## 8.5 Risk Levels

| Score Range | Risk Level | General Response |
| ----------- | ---------- | ---------------- |
|             | Low        |                  |
|             | Medium     |                  |
|             | High       |                  |
|             | Critical   |                  |

**Approved Threshold Reference:**

***

# 9. Risk Identification

## 9.1 Risk Identification Methods

Applicable methods may include:

* workshops;
* interviews;
* stakeholder consultation;
* process analysis;
* technical analysis;
* data analysis;
* model testing;
* incident review;
* monitoring;
* assurance;
* regulatory analysis;
* expert assessment.

**Methods Used:**

## 9.2 Risk Taxonomy

Potential categories include:

* Governance
* Strategic
* Legal / Regulatory
* Privacy
* Security
* Fairness
* Discrimination
* Safety
* Reliability
* Robustness
* Resilience
* Transparency
* Explainability
* Human Oversight
* Data
* Model
* Operational
* Third Party
* Supply Chain
* Reputational
* Financial
* Societal
* Other

**Applicable Categories:**

***

# 10. Risk Statement Structure

Each material risk should be expressed in a structured manner.

Recommended structure:

**Cause → Risk Event → Consequence**

## 10.1 Example

**Cause:**

**Risk Event:**

**Potential Consequence:**

**Complete Risk Statement:**

***

# 11. Risk Register

| Risk ID | Risk Statement | Category | Lifecycle Stage | Owner | Status |
| ------- | -------------- | -------- | --------------- | ----- | ------ |
|         |                |          |                 |       |        |
|         |                |          |                 |       |        |
|         |                |          |                 |       |        |
|         |                |          |                 |       |        |

***

# 12. Individual Risk Assessment

## 12.1 Risk Identification

**Risk ID:**

**Risk Title:**

**Risk Category:**

**Lifecycle Stage:**

**Risk Owner:**

**Control Owner(s):**

## 12.2 Cause

**Risk Cause(s):**

## 12.3 Risk Event

**Risk Event:**

## 12.4 Consequence

**Potential Consequence(s):**

## 12.5 Affected Stakeholders

**Affected Stakeholders / Persons:**

## 12.6 Potential Harm

**Potential Harm:**

***

# 13. Inherent Risk Assessment

Inherent risk represents the level of risk before considering the effectiveness of controls.

## 13.1 Likelihood

**Likelihood Score:**

**Likelihood Level:**

**Likelihood Rationale:**

## 13.2 Impact

**Impact Score:**

**Impact Level:**

**Impact Rationale:**

## 13.3 Inherent Risk

**Inherent Risk Score:**

**Inherent Risk Level:**

**Inherent Risk Rationale:**

***

# 14. Inherent Risk Factors

Additional factors may be considered where relevant.

| Factor        | Assessment | Rationale |
| ------------- | ---------- | --------- |
| Exposure      |            |           |
| Duration      |            |           |
| Frequency     |            |           |
| Scale         |            |           |
| Reversibility |            |           |
| Detectability |            |           |
| Uncertainty   |            |           |
| Dependency    |            |           |

***

# 15. Existing Controls

## 15.1 Controls Addressing the Risk

| Control ID | Control Name | Control Objective | Owner | Status | Evidence |
| ---------- | ------------ | ----------------- | ----- | ------ | -------- |
|            |              |                   |       |        |          |
|            |              |                   |       |        |          |
|            |              |                   |       |        |          |

## 15.2 Preventive Controls

**Preventive Controls:**

## 15.3 Detective Controls

**Detective Controls:**

## 15.4 Corrective Controls

**Corrective Controls:**

***

# 16. Control Effectiveness

## 16.1 Control Design

**Design Effectiveness:**

* Effective
* Partially Effective
* Ineffective
* Not Assessed

**Rationale:**

## 16.2 Control Implementation

**Implementation Status:**

* Implemented
* Partially Implemented
* Not Implemented
* Not Verified

**Rationale:**

## 16.3 Operating Effectiveness

**Operating Effectiveness:**

* Effective
* Partially Effective
* Ineffective
* Not Tested

**Rationale:**

## 16.4 Evidence Quality

**Evidence Quality:**

* Strong
* Adequate
* Moderate
* Weak
* Missing

**Rationale:**

***

# 17. Risk Treatment

## 17.1 Treatment Decision

Possible treatment options include:

* Avoid
* Reduce
* Mitigate
* Transfer
* Restrict
* Accept
* Suspend
* Retire
* Other

**Selected Treatment:**

## 17.2 Treatment Rationale

**Rationale:**

## 17.3 Treatment Objective

**Treatment Objective:**

## 17.4 Treatment Owner

**Treatment Owner:**

***

# 18. Treatment Plan

| Treatment ID | Action | Risk | Owner | Priority | Target Date | Status | Evidence |
| ------------ | ------ | ---- | ----- | -------- | ----------- | ------ | -------- |
|              |        |      |       |          |             |        |          |
|              |        |      |       |          |             |        |          |
|              |        |      |       |          |             |        |          |

***

# 19. Additional Controls

Where existing controls are insufficient, identify additional controls.

| Control ID | New / Modified Control | Objective | Owner | Priority | Target Date | Status |
| ---------- | ---------------------- | --------- | ----- | -------- | ----------- | ------ |
|            |                        |           |       |          |             |        |
|            |                        |           |       |          |             |        |

***

# 20. Residual Risk Assessment

Residual risk represents the risk remaining after considering implemented or committed controls and treatment.

## 20.1 Residual Likelihood

**Likelihood Score:**

**Likelihood Level:**

**Rationale:**

## 20.2 Residual Impact

**Impact Score:**

**Impact Level:**

**Rationale:**

## 20.3 Residual Risk

**Residual Risk Score:**

**Residual Risk Level:**

**Rationale:**

***

# 21. Residual Risk Comparison

| Risk Measure  | Score | Level |
| ------------- | ----: | ----- |
| Inherent Risk |       |       |
| Residual Risk |       |       |

**Risk Reduction Summary:**

***

# 22. Risk Acceptance

## 22.1 Acceptance Required

**Is Formal Risk Acceptance Required?**

* Yes
* No
* To Be Determined

## 22.2 Acceptance Criteria

Risk acceptance should consider:

* risk appetite;
* risk tolerance;
* potential harm;
* legal and regulatory requirements;
* control effectiveness;
* evidence quality;
* reversibility;
* uncertainty;
* availability of safer alternatives.

**Acceptance Analysis:**

## 22.3 Acceptance Authority

**Risk Acceptance Authority:**

## 22.4 Acceptance Record

**Risk Acceptance Record ID:**

**Acceptance Date:**

**Acceptance Status:**

**Acceptance Conditions:**

**Expiry / Review Date:**

***

# 23. Risk Escalation

## 23.1 Escalation Trigger

Potential triggers include:

* critical risk;
* risk above tolerance;
* ineffective critical control;
* material incident;
* significant change;
* monitoring threshold breach;
* legal or regulatory concern;
* unresolved uncertainty.

**Applicable Trigger:**

## 23.2 Escalation Path

**Escalation Path:**

## 23.3 Escalation Authority

**Escalation Authority:**

## 23.4 Escalation Decision

**Decision:**

* Treat
* Restrict
* Accept
* Escalate Further
* Suspend
* Retire
* Other

**Decision Rationale:**

***

# 24. Risk Monitoring

## 24.1 Risk Indicators

| Risk Indicator | Threshold | Frequency | Owner | Escalation | Evidence |
| -------------- | --------- | --------- | ----- | ---------- | -------- |
|                |           |           |       |            |          |
|                |           |           |       |            |          |
|                |           |           |       |            |          |

## 24.2 Monitoring Requirements

**Monitoring Requirements:**

## 24.3 Trigger Conditions

Risk reassessment should occur when:

* material incidents occur;
* material changes occur;
* risk indicators deteriorate;
* control effectiveness declines;
* system context changes;
* new stakeholders become affected;
* regulatory requirements change.

**Additional Triggers:**

***

# 25. Risk Reassessment

## 25.1 Reassessment Trigger

**Reason for Reassessment:**

## 25.2 Reassessment Date

**Date:**

## 25.3 Reassessment Result

**Result:**

* No Material Change
* Risk Increased
* Risk Decreased
* New Risk Identified
* Control Effectiveness Changed
* Classification Review Required
* Other

## 25.4 Reassessment Actions

**Required Actions:**

***

# 26. Scenario Analysis

Where appropriate, assess different plausible operating scenarios.

| Scenario | Description | Likelihood | Impact | Risk | Treatment |
| -------- | ----------- | ---------: | -----: | ---- | --------- |
| Normal   |             |            |        |      |           |
| Adverse  |             |            |        |      |           |
| Severe   |             |            |        |      |           |
| Extreme  |             |            |        |      |           |

***

# 27. Uncertainty Assessment

## 27.1 Sources of Uncertainty

Potential sources include:

* incomplete data;
* model limitations;
* limited testing;
* emergent behavior;
* changing environment;
* unknown dependencies;
* insufficient historical evidence.

**Applicable Uncertainties:**

## 27.2 Uncertainty Significance

**Uncertainty Level:**

* Low
* Medium
* High
* Critical

**Rationale:**

## 27.3 Uncertainty Treatment

**Treatment:**

***

# 28. Third-Party and Supply-Chain Risk

## 28.1 Third-Party Dependencies

**Relevant Providers / Suppliers:**

## 28.2 Third-Party Risks

**Third-Party Risk:**

## 28.3 Supplier Controls

**Applicable Controls:**

## 28.4 Supplier Evidence

**Evidence IDs:**

***

# 29. Data Risk

## 29.1 Data-Related Risks

Potential risks include:

* inaccurate data;
* incomplete data;
* biased data;
* unrepresentative data;
* poor provenance;
* inappropriate data use;
* privacy issues;
* security exposure;
* data drift.

**Applicable Data Risks:**

## 29.2 Data Risk Controls

**Applicable Controls:**

***

# 30. Model Risk

## 30.1 Model-Related Risks

Potential risks include:

* poor accuracy;
* robustness weakness;
* drift;
* unexpected behavior;
* model failure;
* inappropriate generalization;
* dependency on external models.

**Applicable Model Risks:**

## 30.2 Model Risk Controls

**Applicable Controls:**

***

# 31. Human Oversight Risk

## 31.1 Human Oversight Risks

Potential risks include:

* automation bias;
* inadequate competence;
* insufficient information;
* inability to override;
* unclear responsibility;
* failure to review outputs.

**Applicable Risks:**

## 31.2 Human Oversight Controls

**Applicable Controls:**

***

# 32. Fairness and Impact Risk

## 32.1 Fairness Risks

**Potential Fairness / Discrimination Risks:**

## 32.2 Impact Assessment

**Relevant Impact Assessment ID:**

## 32.3 Fairness Controls

**Applicable Controls:**

***

# 33. Privacy Risk

## 33.1 Privacy Risks

**Potential Privacy Risks:**

## 33.2 Privacy Controls

**Applicable Controls:**

## 33.3 Privacy Assessment

**Privacy Assessment ID:**

***

# 34. Security Risk

## 34.1 Security Risks

**Potential Security Risks:**

## 34.2 Security Controls

**Applicable Controls:**

## 34.3 Security Assessment

**Security Assessment ID:**

***

# 35. Safety and Reliability Risk

## 35.1 Safety Risks

**Potential Safety Risks:**

## 35.2 Reliability Risks

**Potential Reliability Risks:**

## 35.3 Safety / Reliability Controls

**Applicable Controls:**

***

# 36. Lifecycle Risk

Risk should be considered across applicable lifecycle stages.

| Lifecycle Stage | Risk | Controls | Evidence | Status |
| --------------- | ---- | -------- | -------- | ------ |
| Govern          |      |          |          |        |
| Identify        |      |          |          |        |
| Classify        |      |          |          |        |
| Assess          |      |          |          |        |
| Treat           |      |          |          |        |
| Approve         |      |          |          |        |
| Deploy          |      |          |          |        |
| Operate         |      |          |          |        |
| Monitor         |      |          |          |        |
| Assure          |      |          |          |        |
| Improve         |      |          |          |        |
| Change          |      |          |          |        |
| Continue        |      |          |          |        |
| Retire          |      |          |          |        |

***

# 37. Risk-to-Control Traceability

```text id="bg4ktq" theme={null}
Risk
   ↓
Risk Treatment
   ↓
Control
   ↓
Procedure
   ↓
Evidence
   ↓
Control Assessment
   ↓
Residual Risk
```

## 37.1 Traceability Matrix

| Risk ID | Treatment ID | Control ID | Procedure | Evidence ID | Residual Risk |
| ------- | ------------ | ---------- | --------- | ----------- | ------------- |
|         |              |            |           |             |               |
|         |              |            |           |             |               |
|         |              |            |           |             |               |

***

# 38. Risk-to-Lifecycle Traceability

| Risk ID | Lifecycle Stage | Risk Condition | Control | Decision |
| ------- | --------------- | -------------- | ------- | -------- |
|         |                 |                |         |          |
|         |                 |                |         |          |
|         |                 |                |         |          |

***

# 39. Risk-to-Evidence Traceability

| Risk ID | Evidence ID | Evidence Type | Evidence Owner | Evidence Status |
| ------- | ----------- | ------------- | -------------- | --------------- |
|         |             |               |                |                 |
|         |             |               |                |                 |
|         |             |               |                |                 |

***

# 40. Incident Relationship

## 40.1 Related Incidents

| Incident ID | Date | Severity | Risk Impact | Corrective Action | Status |
| ----------- | ---- | -------- | ----------- | ----------------- | ------ |
|             |      |          |             |                   |        |
|             |      |          |             |                   |        |

## 40.2 Incident-Driven Reassessment

**Did an incident trigger this assessment?**

* Yes
* No

**Incident Reference:**

***

# 41. Change Relationship

## 41.1 Related Changes

| Change ID | Date | Change Description | Risk Impact | Classification Impact | Status |
| --------- | ---- | ------------------ | ----------- | --------------------- | ------ |
|           |      |                    |             |                       |        |
|           |      |                    |             |                       |        |

## 41.2 Change-Driven Reassessment

**Did a change trigger this assessment?**

* Yes
* No

**Change Reference:**

***

# 42. Assurance Relationship

## 42.1 Related Assurance

| Assurance ID | Date | Finding | Risk Impact | Status |
| ------------ | ---- | ------- | ----------- | ------ |
|              |      |         |             |        |
|              |      |         |             |        |

## 42.2 Assurance Findings

**Open Findings Affecting This Risk Assessment:**

***

# 43. Evidence Profile

## 43.1 Evidence Repository

**Evidence Repository:**

**Evidence Owner:**

## 43.2 Supporting Evidence

| Evidence ID | Evidence Type | Description | Owner | Date | Location |
| ----------- | ------------- | ----------- | ----- | ---- | -------- |
|             |               |             |       |      |          |
|             |               |             |       |      |          |
|             |               |             |       |      |          |

## 43.3 Evidence Quality

**Overall Evidence Quality:**

* Strong
* Adequate
* Moderate
* Weak
* Missing

**Rationale:**

## 43.4 Evidence Gaps

**Evidence Gaps:**

***

# 44. Risk Assessment Findings

## 44.1 Findings

| Finding ID | Finding | Severity | Owner | Action | Status |
| ---------- | ------- | -------- | ----- | ------ | ------ |
|            |         |          |       |        |        |
|            |         |          |       |        |        |

## 44.2 Critical Findings

**Critical Findings:**

***

# 45. Risk Decision

## 45.1 Overall Risk Decision

**Decision:**

* Accept
* Accept with Conditions
* Treat Further
* Restrict
* Escalate
* Suspend
* Retire
* Other

## 45.2 Decision Rationale

**Rationale:**

## 45.3 Decision Authority

**Decision Authority:**

## 45.4 Decision Date

**Date:**

***

# 46. Management Review

## 46.1 Management Review Required

**Required:**

## 46.2 Management Review Reference

**Review ID:**

**Review Date:**

## 46.3 Management Review Outcome

**Outcome:**

## 46.4 Management Actions

**Actions:**

***

# 47. Overall Assessment Conclusion

**Overall Assessment Conclusion:**

## 47.1 Key Findings

*
*
*

## 47.2 Key Risks

*
*
*

## 47.3 Key Controls

*
*
*

## 47.4 Residual Risk Position

**Overall Residual Risk Position:**

## 47.5 Recommended Governance Decision

**Recommendation:**

***

# 48. Assessment Approval

## 48.1 Prepared By

**Name:**

**Role:**

**Date:**

## 48.2 Reviewed By

**Name:**

**Role:**

**Date:**

## 48.3 Approved By

**Name:**

**Role:**

**Date:**

## 48.4 Approval Decision

**Decision:**

* Approved
* Approved with Conditions
* Returned for Reassessment
* Deferred
* Rejected

**Conditions:**

***

# 49. Assessment Review and Reassessment Schedule

## 49.1 Scheduled Review

**Review Frequency:**

**Next Review Date:**

**Review Owner:**

## 49.2 Triggered Reassessment

**Required Triggers:**

* material incident;
* material change;
* significant monitoring deviation;
* control failure;
* classification change;
* regulatory change;
* material context change.

**Additional Triggers:**

***

# 50. Assessment Change History

| Version | Date | Change             | Changed By | Reviewer | Approval |
| ------- | ---- | ------------------ | ---------- | -------- | -------- |
| 0.1     |      | Initial assessment |            |          |          |
|         |      |                    |            |          |          |

***

# 51. Assessment Traceability

The assessment should maintain links to relevant AIGO records.

| AIGO Record            | Identifier |
| ---------------------- | ---------- |
| Governance Record      |            |
| AI System Registration |            |
| AI System Profile      |            |
| Classification Record  |            |
| Control Assessment     |            |
| Approval Record        |            |
| Monitoring Plan        |            |
| Incident Records       |            |
| Change Records         |            |
| Assurance Records      |            |
| Risk Acceptance Record |            |
| Improvement Records    |            |
| Retirement Record      |            |
| Evidence Records       |            |

***

# 52. Risk Assessment Completion Checklist

* [ ] Assessment ID assigned
* [ ] AI System ID identified
* [ ] Assessment type identified
* [ ] Scope documented
* [ ] Organizational context assessed
* [ ] AI-system context documented
* [ ] Stakeholders identified
* [ ] Affected persons identified
* [ ] Potential harms assessed
* [ ] Risk methodology identified
* [ ] Risk taxonomy applied
* [ ] Risks identified
* [ ] Risk statements documented
* [ ] Inherent likelihood assessed
* [ ] Inherent impact assessed
* [ ] Inherent risk determined
* [ ] Existing controls identified
* [ ] Control effectiveness assessed
* [ ] Treatment determined
* [ ] Additional controls identified
* [ ] Residual likelihood assessed
* [ ] Residual impact assessed
* [ ] Residual risk determined
* [ ] Risk acceptance assessed
* [ ] Escalation requirements assessed
* [ ] Monitoring requirements established
* [ ] Reassessment triggers established
* [ ] Relevant specialist risks assessed
* [ ] Incident relationships reviewed
* [ ] Change relationships reviewed
* [ ] Assurance relationships reviewed
* [ ] Evidence reviewed
* [ ] Evidence gaps recorded
* [ ] Findings recorded
* [ ] Overall risk decision recorded
* [ ] Management review completed where required
* [ ] Assessment approved
* [ ] Next review date established
* [ ] Related AIGO records linked

***

# 53. Template Usage Instructions

This template should be completed according to the organization's approved AIGO AI Risk Assessment Procedure.

The risk assessment should be:

* evidence-based;
* risk-based;
* lifecycle-aware;
* proportional to the AI system;
* documented;
* attributable;
* reviewable;
* periodically reassessed.

Risk assessment should be updated when:

* material changes occur;
* significant incidents occur;
* monitoring identifies material deviations;
* controls change;
* control effectiveness changes;
* affected stakeholders change;
* the operating context changes;
* classification changes;
* legal or regulatory requirements change.

A risk assessment should not be treated as permanently valid simply because the AI system has already received approval.

***

# 54. Template Governance

## 54.1 Template Owner

**Template Owner:**

## 54.2 Template Review

**Review Frequency:**

**Next Review Date:**

## 54.3 Template Change Control

Changes to this template should be managed through the applicable AIGO document and change-management process.

Material changes should consider their effect on:

* AI Risk Assessment Procedure;
* AI System Registration;
* AI System Profile;
* Classification;
* Control Assessment;
* Risk Acceptance;
* Approval;
* Monitoring;
* Incident Management;
* Change Management;
* Assurance;
* schemas;
* mappings;
* tools.

***

# 55. Document Control

| Field               | Value                              |
| ------------------- | ---------------------------------- |
| Document            | AIGO — AI Risk Assessment Template |
| Version             | 0.1                                |
| Status              | Draft                              |
| Document Identifier | `AIGO-TPL-005`                     |
| Document Type       | AI Risk Assessment Template        |
| Template Owner      |                                    |
| Approved By         |                                    |
| Approval Date       |                                    |
| Effective Date      |                                    |
| Next Review Date    |                                    |

***

# 56. Template Status

**Document:** AIGO — AI Risk Assessment Template

**Version:** 0.1

**Status:** Draft

**Working Name:** AIGO

**Full Name:** AI Governance Operating Framework

**Document Identifier:** `AIGO-TPL-005`

**Document Type:** AI Risk Assessment Template

This template provides the controlled structure for identifying, analyzing, evaluating, treating, accepting, monitoring, and reassessing AI risks throughout the AIGO AI governance lifecycle.

***

# 57. End of Template

**AIGO — AI Risk Assessment Template**

**Document ID:** `AIGO-TPL-005`

**Version:** 0.1

**Status:** Draft

**End of Template**